• PROFILE
    • CONTACT INFO
  • TEAM-WORK
  • TEAM-ED
  • TEAM-CHURCH
  • TEAM-HOME
  • NEWS
Menu

TEAM Architecture - LLC

P.O. Box 43
Andover, Kansas 67002
(316) 347-7755

Your Custom Text Here

TEAM Architecture - LLC

  • ABOUT
    • PROFILE
    • CONTACT INFO
  • TEAM-WORK
  • TEAM-ED
  • TEAM-CHURCH
  • TEAM-HOME
  • NEWS
SITE DEVELOPMENT PLAN

USD 471 - DEXTER

Dexter Schools - U. S. D. No. 471 will hold a bond election for school facilities improvements in November 2019. Learn more about Dexter Schools here.

The bond election scope of work includes:

SITE WORK

• RELOCATE EXISTING OUTDOOR BASKETBALL COURT EAST OF ELEMENTARY BUILDING.

• PROVIDE BUS DROP-OFF LANE SOUTH OF ELEMENTARY & HIGH SCHOOL BUILDINGS.

• PROVIDE FOR STREET PARKING ON BOTH SIDES OF MAIN STREET EAST OF ELEMENTARY SCHOOL.

NEW CONNECTING LINK

• CONSTRUCT NEW LINK SYSTEM TO CONNECT ELEMENTARY & HIGH SCHOOL BUILDINGS FOR SECURITY.

• CONSTRUCT NEW CAMPUS ENTRANCE FACING MAIN ST.

HIGH SCHOOL BUILDING

• ATTACH CONNECTING LINK.

ELEMENTARY BUILDING

• KEEP EXISTING EXTERIOR WALLS & ROOF.

• INSULATE EXTERIOR WALLS.

• INSULATE ROOF.

• REPLACE EXISTING ROOFING MATERIALS.

• COMPLETELY DEMOLISH INTERIOR & DEVELOP NEW LAYOUT.

• PROVIDE OFFICE / RECEPTION / MEETING SPACE

• CLASSROOMS TO ACCOMMODATE 20-25 STUDENTS

• CONSIDER REPLACING FLOOR SLAB.

• REPLACE WINDOWS THROUGHOUT.

• CUT IN NEW DOORS AT EXISTING BUILDING AS NEEDED.

• ADD KINDERGARTEN & PRE-K SPACE AS SAFE ROOM @ NORTH END OF EXISTING BUILDING.

• ADD ADMINISTRATIVE AREA

• ATTACH CONNECTING LINK.

AUDITORIUM BUILDING

• REPAIR EXTERIOR MASONRY AS NEEDED.

• REPLACE EXISTING ROOFING MATERIALS.

• DEMOLISH EXISTING RESTROOMS & WEIGHT ROOM.

• CONSTRUCT NEW RESTROOMS & REMODELED LOBBY.

• DEMOLISH BLEACHERS & INFILL BASEMENT BELOW TO EXPAND FLOOR SPACE FOR MULTIPURPOSE.

• REPLACE FLOOR @ MULTIPURPOSE.

• REPLACE WINDOWS THROUGHOUT.

• REFURBISH STAGE FOR THEATRICAL USAGE.

• PROVIDE ACOUSTICAL ADJUSTMENTS AS NEEDED.

USD 471 - DEXTER

Dexter Schools - U. S. D. No. 471 will hold a bond election for school facilities improvements in November 2019. Learn more about Dexter Schools here.

The bond election scope of work includes:

SITE WORK

• RELOCATE EXISTING OUTDOOR BASKETBALL COURT EAST OF ELEMENTARY BUILDING.

• PROVIDE BUS DROP-OFF LANE SOUTH OF ELEMENTARY & HIGH SCHOOL BUILDINGS.

• PROVIDE FOR STREET PARKING ON BOTH SIDES OF MAIN STREET EAST OF ELEMENTARY SCHOOL.

NEW CONNECTING LINK

• CONSTRUCT NEW LINK SYSTEM TO CONNECT ELEMENTARY & HIGH SCHOOL BUILDINGS FOR SECURITY.

• CONSTRUCT NEW CAMPUS ENTRANCE FACING MAIN ST.

HIGH SCHOOL BUILDING

• ATTACH CONNECTING LINK.

ELEMENTARY BUILDING

• KEEP EXISTING EXTERIOR WALLS & ROOF.

• INSULATE EXTERIOR WALLS.

• INSULATE ROOF.

• REPLACE EXISTING ROOFING MATERIALS.

• COMPLETELY DEMOLISH INTERIOR & DEVELOP NEW LAYOUT.

• PROVIDE OFFICE / RECEPTION / MEETING SPACE

• CLASSROOMS TO ACCOMMODATE 20-25 STUDENTS

• CONSIDER REPLACING FLOOR SLAB.

• REPLACE WINDOWS THROUGHOUT.

• CUT IN NEW DOORS AT EXISTING BUILDING AS NEEDED.

• ADD KINDERGARTEN & PRE-K SPACE AS SAFE ROOM @ NORTH END OF EXISTING BUILDING.

• ADD ADMINISTRATIVE AREA

• ATTACH CONNECTING LINK.

AUDITORIUM BUILDING

• REPAIR EXTERIOR MASONRY AS NEEDED.

• REPLACE EXISTING ROOFING MATERIALS.

• DEMOLISH EXISTING RESTROOMS & WEIGHT ROOM.

• CONSTRUCT NEW RESTROOMS & REMODELED LOBBY.

• DEMOLISH BLEACHERS & INFILL BASEMENT BELOW TO EXPAND FLOOR SPACE FOR MULTIPURPOSE.

• REPLACE FLOOR @ MULTIPURPOSE.

• REPLACE WINDOWS THROUGHOUT.

• REFURBISH STAGE FOR THEATRICAL USAGE.

• PROVIDE ACOUSTICAL ADJUSTMENTS AS NEEDED.

SITE DEVELOPMENT PLAN

SITE DEVELOPMENT PLAN

CAMPUS VIEW

CAMPUS VIEW

NEW ELEMENTARY / CAMPUS ENTRANCE

NEW ELEMENTARY / CAMPUS ENTRANCE

HIGH SCHOOL ENTRANCE FROM NORTH

HIGH SCHOOL ENTRANCE FROM NORTH

HIGH SCHOOL ENTRANCE FROM SOUTH

HIGH SCHOOL ENTRANCE FROM SOUTH

AUDITORIUM REMODEL - STAGE VIEW

AUDITORIUM REMODEL - STAGE VIEW

AUDITORIUM REMODEL - REAR WALL

AUDITORIUM REMODEL - REAR WALL

Together Everyone Achieves More