Your Custom Text Here
The TEAMED Gallery represents the collaborative EDUCATIONAL design projects created by TEAM Architecture - LLC in cooperation with our SCHOOL and EDUCATION based clients.
Dexter Schools - U. S. D. No. 471 will hold a bond election for school facilities improvements in November 2019. Learn more about Dexter Schools here.
The bond election scope of work includes:
SITE WORK
• RELOCATE EXISTING OUTDOOR BASKETBALL COURT EAST OF ELEMENTARY BUILDING.
• PROVIDE BUS DROP-OFF LANE SOUTH OF ELEMENTARY & HIGH SCHOOL BUILDINGS.
• PROVIDE FOR STREET PARKING ON BOTH SIDES OF MAIN STREET EAST OF ELEMENTARY SCHOOL.
NEW CONNECTING LINK
• CONSTRUCT NEW LINK SYSTEM TO CONNECT ELEMENTARY & HIGH SCHOOL BUILDINGS FOR SECURITY.
• CONSTRUCT NEW CAMPUS ENTRANCE FACING MAIN ST.
HIGH SCHOOL BUILDING
• ATTACH CONNECTING LINK.
ELEMENTARY BUILDING
• KEEP EXISTING EXTERIOR WALLS & ROOF.
• INSULATE EXTERIOR WALLS.
• INSULATE ROOF.
• REPLACE EXISTING ROOFING MATERIALS.
• COMPLETELY DEMOLISH INTERIOR & DEVELOP NEW LAYOUT.
• PROVIDE OFFICE / RECEPTION / MEETING SPACE
• CLASSROOMS TO ACCOMMODATE 20-25 STUDENTS
• CONSIDER REPLACING FLOOR SLAB.
• REPLACE WINDOWS THROUGHOUT.
• CUT IN NEW DOORS AT EXISTING BUILDING AS NEEDED.
• ADD KINDERGARTEN & PRE-K SPACE AS SAFE ROOM @ NORTH END OF EXISTING BUILDING.
• ADD ADMINISTRATIVE AREA
• ATTACH CONNECTING LINK.
AUDITORIUM BUILDING
• REPAIR EXTERIOR MASONRY AS NEEDED.
• REPLACE EXISTING ROOFING MATERIALS.
• DEMOLISH EXISTING RESTROOMS & WEIGHT ROOM.
• CONSTRUCT NEW RESTROOMS & REMODELED LOBBY.
• DEMOLISH BLEACHERS & INFILL BASEMENT BELOW TO EXPAND FLOOR SPACE FOR MULTIPURPOSE.
• REPLACE FLOOR @ MULTIPURPOSE.
• REPLACE WINDOWS THROUGHOUT.
• REFURBISH STAGE FOR THEATRICAL USAGE.
• PROVIDE ACOUSTICAL ADJUSTMENTS AS NEEDED.
TEAM Architecture - LLC worked with Central - Burden USD 462 to improve safety and security for the students and staff in their district. We collaborated with district personnel to design a new activities entrance / safe room addition, a main entrance / security remodel and improvements to the existing gymnasium.
In April 2015, the patrons of USD 463 - Udall, Kansas passed a bond election approving $5.95 million for the construction of a number of improvements to district facilities. Projects include:
The current Baseball Field is located adjacent to the Football Field which currently serves as the outfield space. The Baseball Field must be relocated to accommodate other projects. It will be relocated to the west edge of the School property and will include lighting, relocated bleachers and press box.
The Auditorium Addition will be approximately 19,000 s.f. slab-on-grade, steel framed construction located adjacent to the south wall of the existing West Gymnasium and west of the existing High School Classroom area. The Auditorium and will provide over 500 seats and will include theatrical lighting and sound system to enhance performances. A Band classroom area and future Choir classroom are included.
The current Running Track is in disrepair and must be rebuilt. The new Track will be located around the existing Football Field. The project will include field event facilities, bleachers and press box.
The Elementary School Classroom Addition will be approximately 4,000 s.f. slab-on-grade, steel framed construction located to the north of the existing west wing of the Elementary School. This addition replaces an existing portable building. It will include (4) Classrooms, Office and Restrooms.
The Bus Maintenance Facility will be located south of the existing Jr. High School wing. It will be approximately 2,000 s.f. slab-on-grade, wood framed structure. It will house an Office, Restroom, Meeting Room, Bus Maintenance Bay and Van Maintenance Bay. The design of the building will consider the future addition of covered parking areas for buses and vans
The existing High School Classroom Remodel project involves replacing casework in the FACS Classroom and the Science Lab. New piping is to be provided to serve the new Science Lab stations.
A Construction View of the Auditorium from a similar vantage point as the rendering above.